What a Well-Run Project Looks Like
Four project types, four proven playbooks. Each configuration below shows the typical specification we source, and exactly what we verify before your deposit leaves your account.
FIFO Camp Accommodation Programs

From 20-room expansions to 200-bed villages — sourced to NCC Class 3, verified at the factory, documented for your certifier.
| Typical Size | 20 – 200 rooms |
| Building Class | NCC Class 3 |
| Fire Rating | 60/60/60 (AS 1530.4) |
| Wind Rating | N3 standard / C2 cyclone option |
| Typical Timeline | 6 – 9 months end to end |
What We Verify For You
- Class 3 classification confirmed before design — the most common camp failure avoided
- Fire-test evidence matched to the exact wall build-up being supplied
- Cyclone rating verified for your actual site, not the brochure default
- Landed-cost breakdown: factory, freight, duty, transport, installation
CDC & VC253 Granny Flats

60m² designs pre-checked against the NSW CDC and Victorian VC253/282 pathways — so approval is a process, not a gamble.
| Typical Size | 55 – 60m² (2 bed / 1 bath) |
| Building Class | NCC Class 1a |
| Approval Path | NSW CDC / VIC VC253-282 |
| Energy Rating | 6-Star NatHERS |
| Typical Timeline | 14 – 18 weeks end to end |
What We Verify For You
- Design checked against CDC exempt/complying criteria before you commit
- NatHERS certificate and BASIX documentation assembled at the source
- WaterMark and SAA certificates verified — the two most common import failures
- Realistic approval timeline mapped for your council area
Off-Grid Cabin Clusters

Self-sufficient cabins for eco-tourism operators — solar, battery and water systems specified and tested before shipping.
| Typical Setup | 1 – 10 cabin clusters |
| Solar / Battery | 5kW / 10kWh standard |
| Water | 5,000L rainwater collection |
| Bushfire Rating | BAL-12.5 standard / BAL-29 option |
| Typical Timeline | 10 – 14 weeks end to end |
What We Verify For You
- Off-grid systems sized for your actual site occupancy, not the data sheet
- BAL rating confirmed against your site assessment before specification
- Electrical certification for standalone power systems arranged at factory
- ROI-oriented configuration advice — what pays back and what is decoration
Specialist & One-Off Buildings

Site offices, clinics, classrooms, kiosks — if you can specify it, we can find the right factory and certify it for Australia.
| Order Size | From 1 unit |
| Building Class | NCC Class 1 – 9 |
| Engineering | RPEQ certification available |
| Design Input | Your architect or factory standard |
| Typical Timeline | Project dependent |
What We Verify For You
- Factory matching — which plants can actually build your specification
- NCC class determination for unusual building types
- RPEQ engineering liaison and documentation management
- Single-unit orders welcome — no minimum quantity games
These are typical configurations, not past-client showcases. Every project we manage is confidential by default — we are happy to walk you through relevant experience on a call, under NDA where required.
Have a Project in Mind?
Send us the parameters — site, size, timeline. We'll return an itemised assessment: compliance pathway, realistic budget ranges, and the risks to watch.