What a Well-Run Project Looks Like

Four project types, four proven playbooks. Each configuration below shows the typical specification we source, and exactly what we verify before your deposit leaves your account.

Mining & Resources

FIFO Camp Accommodation Programs

FIFO Camp Accommodation Programs

From 20-room expansions to 200-bed villages — sourced to NCC Class 3, verified at the factory, documented for your certifier.

Typical Size20 – 200 rooms
Building ClassNCC Class 3
Fire Rating60/60/60 (AS 1530.4)
Wind RatingN3 standard / C2 cyclone option
Typical Timeline6 – 9 months end to end

What We Verify For You

  • Class 3 classification confirmed before design — the most common camp failure avoided
  • Fire-test evidence matched to the exact wall build-up being supplied
  • Cyclone rating verified for your actual site, not the brochure default
  • Landed-cost breakdown: factory, freight, duty, transport, installation
Residential Infill

CDC & VC253 Granny Flats

CDC & VC253 Granny Flats

60m² designs pre-checked against the NSW CDC and Victorian VC253/282 pathways — so approval is a process, not a gamble.

Typical Size55 – 60m² (2 bed / 1 bath)
Building ClassNCC Class 1a
Approval PathNSW CDC / VIC VC253-282
Energy Rating6-Star NatHERS
Typical Timeline14 – 18 weeks end to end

What We Verify For You

  • Design checked against CDC exempt/complying criteria before you commit
  • NatHERS certificate and BASIX documentation assembled at the source
  • WaterMark and SAA certificates verified — the two most common import failures
  • Realistic approval timeline mapped for your council area
Tourism & Eco

Off-Grid Cabin Clusters

Off-Grid Cabin Clusters

Self-sufficient cabins for eco-tourism operators — solar, battery and water systems specified and tested before shipping.

Typical Setup1 – 10 cabin clusters
Solar / Battery5kW / 10kWh standard
Water5,000L rainwater collection
Bushfire RatingBAL-12.5 standard / BAL-29 option
Typical Timeline10 – 14 weeks end to end

What We Verify For You

  • Off-grid systems sized for your actual site occupancy, not the data sheet
  • BAL rating confirmed against your site assessment before specification
  • Electrical certification for standalone power systems arranged at factory
  • ROI-oriented configuration advice — what pays back and what is decoration
Custom Projects

Specialist & One-Off Buildings

Specialist & One-Off Buildings

Site offices, clinics, classrooms, kiosks — if you can specify it, we can find the right factory and certify it for Australia.

Order SizeFrom 1 unit
Building ClassNCC Class 1 – 9
EngineeringRPEQ certification available
Design InputYour architect or factory standard
Typical TimelineProject dependent

What We Verify For You

  • Factory matching — which plants can actually build your specification
  • NCC class determination for unusual building types
  • RPEQ engineering liaison and documentation management
  • Single-unit orders welcome — no minimum quantity games

These are typical configurations, not past-client showcases. Every project we manage is confidential by default — we are happy to walk you through relevant experience on a call, under NDA where required.